‹ REFERENCES

Eide Smolt AS

On growing facility for Salmon production

Fact file

  • Construction Client: Eide Smolt AS / Eide Family AS
  • Design and Build Contractor: Artec Aqua AS
  • Construction Start: Mai 2024
  • Facility Hand-over: Desember 2024
  • Total Tank Volume: 2580 m3
  • Technologies: Hybrid
  • Water Qualities: Fresh Water
  • Contract Value: NOK 70 million
  • Location: Sundal, Hardanger, Vestland County